Solar for land development, real estate developers and commercial developers

A developer who plans for solar at the start can design around it. Retrofitting the same system after construction costs more and fits worse.

Solar energy in development projects

For a residential developer, solar can be a selling point and a way to keep future HOA dues down. For a commercial developer, it can lower operating costs for tenants or provide income. For a landowner, a solar lease can turn an unused parcel into rent for decades.

A solar field for a residential community

Buyers in master-planned communities look closely at HOA fees, and common-area electricity is one of the larger costs an association carries. If you set aside a tract of land for a solar field during planning, the future association can offset power for the clubhouse, lighting, irrigation and other shared systems from day one. The same thinking applies to a golf community or a mixed-use center, where carports over parking can generate power and shade cars at the same time.

Some states push this further. California, for example, has required solar on most new homes since 2020 under its building energy code. Even where it is optional, a development marketed with solar gives sales staff something positive to say when buyers ask about running costs.

Designing solar-ready buildings

Leasing land for a solar farm

Landowners with large, flat, open parcels near transmission or distribution lines sometimes lease them to solar developers. The developer pays rent and handles the permits, construction and eventual removal. Lease terms commonly run 20 years or more, so check the decommissioning terms, the restoration bond, and how the lease affects property taxes and any agricultural status.

Why plan for solar now

Adding solar during construction lets you share trenching, electrical work and permitting with the rest of the project. Your engineers can design the site around it, and the utility application can move forward with the other service requests. A developer can also choose between owning the system, transferring it to the association, or arranging a PPA that buyers inherit.

The process: what to expect

  1. Feasibility. An installer or consultant reviews at least a year of electric bills, ideally with interval data, and looks at where panels could go.
  2. Site assessment. Someone visits to measure roofs or land, check shading, and inspect the main electrical service and switchgear.
  3. Proposal and financing. The development entity chooses to own the system or sign a PPA or energy services agreement. Third-party providers will want a credit application and details on who will hold the contract once the project is sold or handed to an association.
  4. Engineering and permits. Licensed engineers prepare stamped structural and electrical drawings, which go to the local building department with the permit application. Review times vary a lot between jurisdictions.
  5. Interconnection. The installer files an interconnection application with the utility. Larger systems may need a utility study and equipment upgrades before approval.
  6. Construction and inspection. After the permit is issued, crews install racking, panels, inverters and wiring, then the building department inspects the work and closes the permit.
  7. Permission to operate. The utility does its own check, sets or reprograms the meter, and gives written approval to switch the system on.